Fast interventions with no demolition required
CCTV inspection of sewage and stormwater stacks
Vertical stacks are critical elements in any building. A single failure can affect multiple floors at the same time.
CCTV inspection allows a precise assessment of the internal condition of these vertical pipes, identifying leaks, cracks and degradation along the system.
When is stack inspection required
This type of inspection is recommended when:
-
Leaks appear between floors
-
Persistent bad odors occur
-
Recurring issues affect multiple units
-
Frequent blockages happen in the same column
-
The building has aging pipe systems
These problems often originate inside the stack and cannot be confirmed without inspection.
Technical diagnosis for rehabilitation
A stack inspection is not only about locating a problem.
It evaluates the structural and functional condition of the pipe along its full height, supporting the correct decision between localized repair or full rehabilitation.
What is analyzed during inspection
-
Cracks and open joints
-
Material loss or internal wear
-
Branch connections
-
Misalignments and deformation
-
Infiltration points and deposits
This level of detail is essential to avoid incorrect solutions.
Importance of rotating cameras
Vertical stacks include lateral connections and complex geometries.
Using 360º rotating cameras allows full inspection of joints, branches and off-axis areas that standard cameras cannot capture.
Basic inspection vs rehabilitation-focused inspection
A basic inspection may only identify blockages or obvious failures.
A rehabilitation-oriented inspection allows:
-
assessment of epoxy or CIPP suitability
-
evaluation of the full extent of damage
-
definition of the correct technical solution
Application in buildings and condominiums
In multi-unit buildings, stacks are shared systems.
An inspection helps stakeholders understand:
-
the actual condition of the pipe
-
the source of leaks
-
whether trenchless rehabilitation is possible
-
intervention priorities
The starting point for any intervention
CCTV inspection is always the first step before any rehabilitation work.
It defines whether the correct approach is:
-
epoxy — for sealing issues
-
CIPP — for structural rehabilitation
Problems in your stack? Start with diagnosis
Without inspection, any intervention is based on assumptions.
With CCTV inspection, decisions are based on real data.
Contact REVIPOX to schedule a technical inspection.
100%
Guaranteed Satisfaction
We rehabilitate pipelines, we restore confidence
REVIPOX is a company specialized in internal epoxy pipe coating, a technology that allows the restoration of aging pipelines without demolition. With trained teams and state-of-the-art equipment, we bring back functionality, durability, and safety to water and wastewater systems in residential, commercial, and industrial buildings.
-
-
Certified technology and long-lasting materials
-
Solutions adapted to every network type and diameter (32 mm to 300 mm)
The REVIPOX Method - New Life For Your Pipes
Contacto e pedido de diagnóstico
Problemas nas tubagens? Podemos ajudar sem obras.
Complete solutions for internal pipe rehabilitation
At REVIPOX, we operate across all stages of the rehabilitation process — from initial inspection to final epoxy coating. Each service is carried out by specialized technicians using advanced technology, ensuring long-lasting results without the need for demolition.
Pipe Video Inspection
High-definition visual diagnostics using HD video cameras to assess the internal condition of the pipes and identify cracks, leaks, or corrosion before intervention.
Mechanical Cleaning and Internal Preparation
We remove scale, debris, and corrosion through controlled brushing and jetting, preparing the pipe surface for perfect epoxy adhesion.
Epoxy Internal Coating
Application of a continuous internal epoxy lining that creates a new protective wall inside the pipe, sealing leaks and preventing future ruptures.
Vertical Pipe and Riser Rehabilitation
An ideal solution for buildings and condominiums, allowing the renewal of vertical water and wastewater risers without opening walls or disrupting residents. Fast, clean, and completely trenchless.
Buried Pipeline Rehabilitation
Internal coating of underground sewer, drainage, or stormwater pipes, eliminating leaks and maintaining structural integrity — no excavation required.
Localized Repairs and Leak Sealing
Targeted repair of internal ruptures, damaged joints, or small leaks using high-adhesion structural resins — a quick, clean, and long-lasting solution.
Why to choose REVIPOX?
Trust the experts who bring new life to your pipelines.
REVIPOX combines technology, precision, and experience to deliver long-lasting epoxy pipe rehabilitation solutions — with no need for demolition. Our work is based on detailed diagnostics, certified materials, and qualified technicians who ensure results that last.
Experienced Team
Our specialists are trained in internal epoxy coating and use advanced inspection and application equipment to guarantee top-quality results every time.
Trusted and Transparent
From the first contact to project completion, we value clear communication and trust. Every client receives a technical report and full professional support throughout the process.
Latest News & Articles from REVIPOX
Follow the REVIPOX Blog to explore the latest updates in epoxy pipe rehabilitation, trenchless technology, and modern solutions for aging pipeline systems. We share technical tips, real case studies, and industry insights for those who want to stay informed about innovation in pipeline restoration.